Public site figures. Confidential commercial terms, redundancy classifications and full single-line diagrams available under NDA.
| Status | Operating |
| Power now | 20 MW |
| Committed expansion | +20 MW |
| Campus | 700,000 sq ft across 4 buildings |
| Lot | 37.6 acres |
| Provenance | Former BlackBerry (Research In Motion) HQ campus, acquired 2025 |
| Compute | NVIDIA Blackwell-class (B300) fleet in production |
| Data residency | Canadian soil, PIPEDA-aligned, no US CLOUD Act exposure |
The SPUR Campus Data Center is built and operated to the same standard across the network - efficient cooling, Canadian data residency, audited controls and Blackwell-class GPUs, owned and run end to end by SPUR.
Free-air and liquid cooling keep efficiency high. The heat that is left over is not dumped to the sky, it is piped into co-located greenhouses and vertical gardens, turning compute waste heat into food.
Every byte stays on Canadian soil. PIPEDA-aligned. Quebec sites are Law 25 ready. No US CLOUD Act exposure - tenants who need sovereign Canadian compute get it without compromise.
Every SPUR site is engineered to meet and exceed SOC 2 Type II, PCI-DSS v4.0 and ISO 27001:2022 control requirements. Control documentation available under NDA.
SPUR owns the sites, SPUR runs the floor. 24/7 monitored, controlled physical access, encrypted overlay mesh between sites, daily cross-site backup of production data.
NVIDIA B300, B200, H200, H100 and RTX Pro. Hourly and reserved-monthly pricing. SSH, Jupyter, vLLM, Ollama and ComfyUI templates ready on day one.
Whether you need a few racks of colocation or a multi-megawatt build, the path starts the same way. One message, one tour, one conversation.