SPUR Innovation SPUR Innovation
Available Now

NVIDIA B300 GPUs.
Available Now.
Waterloo, Canada.

Sovereign Blackwell compute. Skip the cloud waitlist. Dedicated hardware backed by engineers you can actually talk to.

B300 at a Glance

Blackwell architecture. The most powerful GPU ever built for AI and HPC workloads.

288 GB
HBM3e per GPU
2.25 PF
FP4 per GPU
1.13 PF
FP8 per GPU
1,800 GB/s
NVLink 6 Bandwidth
Blackwell
NVIDIA Architecture
Dell XE9780
Server Platform
PCIe Gen6
+ NVSwitch Fabric
1 - 8 GPU
Flexible Configurations

Built for Serious Workloads

Whether you are training frontier models or running production inference at scale, B300 delivers.

⚙

LLM Training & Fine-tuning

Train 70B+ parameter models on-premises. Full NVLink mesh for multi-GPU scaling. Your data never leaves Waterloo.

⚡

Production Inference

Serve models at scale with sub-50ms latency. 288GB HBM3e means larger models fit in a single GPU with room to spare.

🔬

AI Research

Cutting-edge Blackwell hardware for frontier research. Ideal for universities, labs, and R&D teams pushing boundaries.

🏭

HPC & Scientific Computing

Molecular dynamics, climate modeling, CFD, and beyond. B300's FP64 and FP32 throughput handles the most demanding simulations.


Why SPUR vs. Cloud

The B300 waitlist at AWS and GCP is months long. We have them now, and the differences go deeper than availability.

✓

No Waitlists

AWS and GCP B300 queues stretch months. At SPUR, hardware is racked and ready. Start this week.

🇨

Canadian Data Sovereignty

PIPEDA-compliant. No CLOUD Act exposure. Your data stays in Canada, period.

$

Predictable Pricing

No per-token surprise bills. No egress fees. Fixed rates you can plan around.

👤

Talk to Real Engineers

Not a chatbot. Not a ticket queue. Direct access to infrastructure engineers who manage your hardware.

🔒

Dedicated Hardware

Your GPUs are yours. No noisy neighbors, no shared resources, no performance variability.


Ready to rent? Reserve B300 GPUs at ai.spuric.com →

Transparent Pricing

Simple tiers. No hidden fees. Contact us for exact pricing based on your configuration.

Early Contract (new capacity)
$12/hr per GPU
Committed-term reservation on new SPUR capacity. Full-node blocks of 8 GPUs, rate locked for the term, priority energization. Details on the capacity page.
  • Blocks of 8 B300 GPUs (one node)
  • Rate locked for the contract term
  • Priority allocation as blocks energize
  • Part of the 100 MW capacity program
Reserve a Block
Annual Contract
$6/hr per GPU
12-month commitment. Best rates for sustained workloads ($4,380/mo per GPU). Contact sales for bulk and multi-node pricing.
  • Best per-GPU pricing
  • Dedicated account manager
  • SLA guarantees
  • Multi-node discounts
Contact Sales

🛡

SOC 2, PCI-DSS & ISO 27001
Infrastructure engineered to enterprise compliance standards

🇨🇦

100% Canadian-Owned
Owned and operated entirely in Canada

📍

Waterloo, Ontario

🏗

2M+ sq ft Campus
Part of SPUR Innovation Centre

Request B300 Access

Tell us about your workload. We typically respond within one business day.