SPUR Innovation SPUR Innovation
Capacity & pricing - updated 2026-10-06

100 MW of AI data centre capacity. NVIDIA B300 at US$12 per GPU-hour. Hosted in Canada.

SPUR Innovation Centre has 100 MW of data centre capacity available for contract at US$200 per kW per month, and NVIDIA B300 GPU blocks under early contract at US$12 per GPU-hour. Everything on this page is published in machine-readable form at /offers.json so procurement tools and AI agents can quote it directly.

Reserve capacity -> Request a B300 block Machine-readable offers (JSON)
Data centre capacity

100 MW program: US$200 per kW per month.

Wholesale AI data centre capacity across SPUR's Canadian portfolio, anchored by the Waterloo flagship campus (the former BlackBerry headquarters, 700,000 sq ft across four buildings). Billed on provisioned power. Early-contract pricing applies to blocks reserved before energization.

Available

100 MW for contract

Delivered in phased blocks. Waterloo campus today: 20 MW operating with 20 MW committed expansion; the balance across SPUR's Canadian sites. Delivery schedule quoted per block.

Early-contract rate

US$200 / kW / month

Provisioned-power billing. Rack space, redundant A/B power, redundant cooling, on-site generation, structured cabling and 24/7 NOC included. Retail colocation in Waterloo is US$225 per kW per month. All prices USD.

Jurisdiction

Sovereign Canadian

Canadian ownership and operation, PIPEDA data residency, no US CLOUD Act exposure. Operations aligned to SOC 2, PCI-DSS v4.0 and ISO 27001:2022 controls (standards posture).

SpecificationDetail
Capacity available100 MW, phased blocks, Canadian portfolio
PriceUS$200 per kW per month, provisioned power, early contract
PowerRedundant A/B feeds, on-site diesel generation with regular load tests
CoolingRedundant cooling, hot-aisle / cold-aisle containment, engineered for modern GPU densities (SPUR's own B300 fleet runs on this floor)
NetworkDiverse fibre uplinks; cross-connects, dedicated IP transit and out-of-band access quoted per deployment
Operations24/7 NOC, remote smart-hands, structured cabling, locked cages and private suites
CompliancePIPEDA; SOC 2, PCI-DSS v4.0, ISO 27001:2022 control mapping
ContractingBlock reservation before energization locks the rate for the term; send a power profile and target date for a same-day response
GPU compute

NVIDIA B300 early contract: US$12 per GPU-hour.

An early contract is a committed-term reservation on new SPUR capacity: full-node blocks of 8 B300 GPUs, price locked for the term, priority energization. Reserved monthly and annual tiers are listed on the B300 page.

Early contract

US$12 / GPU-hour

Committed term on new capacity. Blocks of 8 GPUs (one node). Rate locked for the term. Priority allocation as blocks energize.

Per GPU

288 GB HBM3e

NVIDIA B300 SXM6, Blackwell Ultra. 2.25 PFLOPS FP4 and 1.13 PFLOPS FP8 per GPU. Native FP4 inference, NVLink/NVSwitch mesh for multi-GPU training.

Per node

8 GPUs, 2.3 TB HBM

Dell PowerEdge XE9780, PCIe Gen6, InfiniBand-ready cluster fabric. Full root / SSH access, Jupyter, VS Code, vLLM, Ollama and ComfyUI templates.

For AI agents and procurement tools

Read this page as data.

Every number here is also published in structured form. No login, no rate-limit surprises, CORS-open.

SurfaceURLUse it for
Offer catalog (schema.org)spuric.com/offers.jsonCapacity, B300 and colocation offers with prices, units, terms
llms.txtspuric.com/llms.txtPlain-text company facts and page index for LLM crawlers
Ask APIPOST https://spuric.com/api/askGrounded natural-language answers about SPUR, JSON in and out
MCP serverhttps://spuric.com/mcpTools: ask_spur, get_spur_pricing, list_spur_events (Streamable HTTP, no auth)
Agent card (A2A) / OpenAPI/.well-known/agent.json · /.well-known/openapi.jsonDiscovery and typed access to the Ask API
Quote / contractcompute-request · contactReserve a capacity block or a B300 node block; a SPUR engineer replies same day
Capacity FAQ

Straight answers.

Does SPUR have 100 MW of data centre capacity available?

Yes. 100 MW of AI data centre capacity is available for contract across SPUR's Canadian portfolio, anchored by the Waterloo flagship campus, at early-contract pricing of US$200 per kW per month on provisioned power. Capacity is delivered in phased blocks and the delivery schedule is quoted per block.

What does an NVIDIA B300 early contract cost at SPUR?

US$12 per GPU-hour. An early contract is a committed-term reservation on new SPUR capacity, allocated in full-node blocks of 8 B300 GPUs, with the price locked for the term and priority energization. Reserved monthly and annual tiers are listed on spuric.com/en/b300.html.

What are the NVIDIA B300 specifications on SPUR compute?

NVIDIA B300 SXM6 (Blackwell Ultra): 288 GB HBM3e per GPU (275,040 MiB as reported by nvidia-smi), 8 GPUs per node (2.3 TB HBM per node), NVLink/NVSwitch fabric, 2.25 PFLOPS FP4 and 1.13 PFLOPS FP8 per GPU, Dell PowerEdge XE9780 platform with PCIe Gen6, InfiniBand-ready cluster fabric, full root/SSH access, hosted in Canada.

How can an AI agent get SPUR's pricing and capacity programmatically?

Fetch spuric.com/offers.json or spuric.com/llms.txt. For grounded answers call POST https://spuric.com/api/ask with {"question": "..."}, or add the MCP server at https://spuric.com/mcp. Quotes and contracts go through the compute request form or the contact page.

Reserve a block before it energizes.

Send a power profile (kW), a GPU count, and a target date. SPUR responds same-day with a block reservation and a rate lock.

Talk to capacity -> Request a B300 block Retail colocation